JAPAN-NUCLEAR-DISASTER
Workers prepare frozen pipes for the construction of an ice wall at the tsunami-crippled Tokyo Electric Power Co.'s Fukushima Daiichi Nuclear Power Plant in Okuma, Fukushima Prefecture, northeast of Tokyo on July 9, 2014. Tokyo Electric Power Co.(TEPCO) will build a frozen ice wall around the buildings of Units 1 to 4 at the tsunami-devastated nuclear power plant to stop radiation-contaminated water from flowing to the sea. TEPCO has been struggling with massive amounts of toxic water as the operator continues to pump water into three reactors to keep them cool. The plant suffered meltdowns at three of its six reactors after a tsunami swept through the facilities in March 2011. AFP PHOTO / POOL / KIMIMASA MAYAMA (Photo by KIMIMASA MAYAMA / POOL / AFP) (Photo by KIMIMASA MAYAMA/POOL/AFP via Getty Images)
COMPRAR LICENCIA
¿Cómo puedo usar esta imagen?
475,00 €
EUR
DETALLES
Restricciones:
Póngase en contacto con su oficina local para conocer todos los usos con fines comerciales o promocionales. Derechos editoriales plenos en Reino Unido, EE.UU., Irlanda, Italia, España y Canadá (excepto Québec). Si desea conocer los derechos editoriales restringidos en otro país, llame a su oficina local.
Crédito:
Editorial n.º:
451901402
Colección:
AFP
Fecha de creación:
09 de julio de 2014
Fecha de subida:
Tipo de licencia:
Inf. de autorización:
No se cuenta con autorizaciones. Más información
Fuente:
AFP
Código de barras:
POOL
Nombre del objeto:
Hkg10040095
Tamaño máx. archivo:
3000 x 2107 px (25,40 x 17,84 cm) - 300 dpi - 2 MB
- Energía nuclear,
- Accidentes y desastres,
- Catástrofe natural,
- Central nuclear,
- Central nuclear de Fukushima Daiichi,
- Crisis,
- Helado - Condición,
- Japón,
- Maremoto,
- Medio ambiente,
- Prefectura Fukushima,
- Preparación,
- Residuo tóxico,
- Sector de la construcción,
- Temas sociales,
- Terremoto y tsunami de Tohoku de 2011,
- Tokio,
- Tokyo Electric Power Company,
- Trabajador fijo,